Sports Direct | DLM Media
Retrofit and cabling

Add screens to the building you already have

Cable path surveys, clean routes through finished spaces, and reuse of the wiring in the walls, so adding screens does not mean tearing anything open.

For owners and facilities teams adding or upgrading screens in occupied restaurants, hotels, clinics, offices, senior living, and leased spaces.

Trusted across gaming, hospitality, auto & healthcare · 30+ years · all 50 states
  • William Hill
  • Mako Gaming
  • Goldie's
  • DSI
  • Moose International
  • Fraternal Order of Eagles
Why it matters

Most buildings are not new. Most screen projects are retrofits.

New construction can plan every cable path from day one. Almost everyone else is adding screens to a space with finished walls, a working business, and a landlord or a budget to respect. Retrofit work is a craft: finding the route that hides the cable, reusing the wiring that already exists, and finishing the job so the room looks like it was designed this way. Structured cabling, done once and documented, also makes the next change easier.

What a retrofit covers

Eight parts of a clean retrofit

None of this is exotic. It is a method for finishing the job so you do not notice it.

A cable path survey

We walk the space and find the routes: above ceilings, through chases, along baseboards, behind cabinets. The survey decides where each cable goes before anyone drills.

Reuse of existing wiring

Coaxial, Ethernet, and fiber already in the building can often carry programming. We test and document what is usable before we recommend adding anything.

Surface raceway where walls must stay closed

When there is no hidden path, paintable raceway and neat corner runs keep cable tidy and protected.

Ceiling and plenum runs

Drop ceilings, open joists, and plenum spaces offer concealed routes, with the right cable type and fire-code awareness for the space.

Equipment location and ventilation

A secure, powered, ventilated place for receivers and distribution equipment, reachable by a technician and away from heat and moisture.

Grounding and surge protection

Proper grounding and surge protection protect the equipment and the building from power events.

Code-conscious work and approvals

We coordinate with your landlord, property manager, and contractor on penetrations, permits, and building rules, and we respect fire-stopping and access requirements.

Labeling and documentation

Every run labeled at both ends and recorded, so the next technician starts with a map instead of a mystery.

Before the technician arrives

Five steps that make a retrofit go smoothly

A little preparation prevents most surprises.

  1. 01

    Walk the space with us

    Show us the rooms, the screens you want, and the places that cannot be disturbed. The best route is rarely the shortest line.

  2. 02

    Check what is already in the walls

    Ask your property manager or previous contractor what was installed. Old drawings and labeled panels save hours.

  3. 03

    Get approvals early

    Landlords and property managers need to approve penetrations, roof access, and visible runs. Do it before the schedule is set.

  4. 04

    Decide what can be visible

    A clean raceway in the right color can be invisible. Decide where that is acceptable and where it is not.

  5. 05

    Plan the schedule around operations

    Install during quiet hours, in phases, and sequence rooms so nothing is out of service longer than necessary.

How it works

A consultative path to a clean finish

The same four steps we use for every commercial project.

  1. 01

    Survey

    A walk-through of the space, the existing wiring, and the equipment location.

  2. 02

    Plan

    A route and materials plan, approvals, and a schedule built around your operations.

  3. 03

    Install

    Professional installation with clean routes, proper grounding, and labeled runs.

  4. 04

    Document and support

    A map of what was installed and one accountable team afterward.

What to bring us

Helpful to have on the first call

  • Floor plans or photos of the rooms that need screens.
  • Anything you know about existing cabling and where it ends.
  • The name of your landlord or property manager, if you lease.
  • Hours when work can happen, and rooms that cannot be disturbed.
  • Whether a renovation is planned that could change the approach.

Prefer to talk it through? Call New Sales at 888-688-1699.

Free, no-pressure quote

Get a quote: Structured Cabling & Retrofit for Commercial TV

Tell us about your space and a commercial programming specialist will follow up. No pressure, just a solution-focused conversation.

Common questions

Structured Cabling & Retrofit for Commercial TV, answered

What owners and managers ask most before they request a quote.

Retrofit means adding or upgrading screens in a building that is already finished and, usually, already operating. It relies on finding concealed routes, reusing existing wiring, and using raceway where there is no hidden path, so the installation looks clean without demolition.

Often, yes. Coaxial, Ethernet, and fiber already in the building can frequently carry programming. We test and document what is usable and tell you plainly if anything needs to be added.

Rarely. We plan routes that avoid opening finished walls: ceilings, chases, raceway, and existing paths. If a wall must be opened, we tell you why before we do it and coordinate repair.

Yes. We schedule installation around service, guests, and care routines, work in phases, and sequence rooms so nothing is out of service longer than necessary.

Get your landlord or property manager involved early. Penetrations, roof access, visible runs, and restoration at lease end are usually covered by the lease. We coordinate with them so the work meets building rules.

Every building is different, so we provide a tailored custom quote after a survey rather than a fixed price. Call New Sales at 888-688-1699 or use the contact form to start.

Plan a clean retrofit

Tell a programming specialist about your building and we will map a route that leaves your walls and your schedule alone. No pressure, no obligation.

Call nowGet a Quote